VYKOL

Solutions

Systems built layer by layer.

Explore typical VYKOL material paths by application. Product links open the current TDS; final system design must be confirmed for the substrate, climate, exposure, code and installation method.
01

Roofing

Complete material paths for single-ply, underlay and insulated roof assemblies.

Mineral-wool steel deck roof

Mechanically fastened single-ply assembly

  1. 01Waterproofing
  2. 02Thermal and fire layer
  3. 03Vapor control
  4. 04Mechanical fixing
  5. 05Structure
    Steel deck

PIR steel deck roof

High thermal efficiency with a cover-board layer

  1. 01Waterproofing
  2. 02Protection
    Fire-resistant cover board
  3. 03Thermal insulation
  4. 04Vapor control
  5. 05Structure
    Steel deck

Pitched-roof underlay

Secondary water-shedding layer beneath the roof covering

  1. 01Roof finish
    Tiles, shingles or metal roofing
  2. 02Underlayment
  3. 03Support
    Timber, OSB, concrete or metal deck

Typical layer order is shown from weather side to structure.

03

Foundations

Waterproofing systems for below-grade concrete, retaining structures, slabs and transitions.

Pre-applied below-grade waterproofing

Typical sequence from ground side to structure

  1. 01Prepared support
    Compacted subgrade or concrete blinding
  2. 02Waterproofing
  3. 03Joints and details
  4. 04Structure
    Cast-in-place reinforced concrete

Pre-applied assemblies bond to the subsequently poured structural concrete.

04

Tunnel & dam

Geomembrane, waterstop and fixing components for water-control and civil-engineering structures.

Tunnel lining waterproofing

Typical sequence from substrate to structural lining

  1. 01Substrate
    Prepared shotcrete or primary lining
  2. 02Protection
    Nonwoven geotextile protection layer
  3. 03Fixing
  4. 04Waterproofing
  5. 05Joint water control
  6. 06Structure
    Secondary concrete lining

The final build-up must follow the project design, loading and exposure requirements.

05

Interior

Liquid-applied waterproofing and prefabricated details for wet rooms and interior transitions.

Wet-area waterproofing

Typical sequence from finish to substrate

  1. 01Finish
    Tile or compatible interior finish
  2. 02Waterproofing
  3. 03Joint reinforcement
  4. 04Substrate
    Prepared concrete, screed or suitable board

Corners, joints and penetrations are reinforced before the field coating is completed.

06

Geotechnical

Containment and water-control materials for infrastructure and ground engineering.

Geomembrane containment lining

Typical protected liner arrangement

  1. 01Upper protection
    Project-specific protective geotextile or cover layer
  2. 02Containment liner
  3. 03Lower protection
    Geotextile or prepared subgrade

Protection layers and seam design are selected for the site conditions and installation method.

07

Repair & refurbishment

Compatible membranes, coatings, tapes and sealants for restoring continuity at damaged areas and details.

Localized envelope repair

Select the repair path to match the existing substrate

  1. 01Exposed membrane repair
  2. 02Liquid-applied repair
  3. 03Sealing and detailing
  4. 04Existing assembly
    Cleaned, sound and compatible substrate

Compatibility and surface preparation must be confirmed before application.

Project-specific support

Need help confirming the final system build-up?

Talk to VYKOL